My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3012
>
2900 - Site Mitigation Program
>
PR0522786
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:10:30 PM
Creation date
6/30/2020 1:55:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0522786
PE
2950
FACILITY_ID
FA0015536
FACILITY_NAME
ARROYOS SMOG SHOP
STREET_NUMBER
3012
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14313024
CURRENT_STATUS
01
SITE_LOCATION
3012 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIT IV LOP <br /> LTCP NO FURTHER ACTION (NFA) CLOSURE CHECK LIST <br /> 8/22/13 <br /> SITE ADDRESS: i DATE: <br /> SITE NAME: r LOP STAFF: <br /> REQUEST FOR CLOSURE NFA) uploaded into GT by RP/consultant, within 60 ys LOP staff reviews and <br /> receives ESI with link to re tor's response in GT. If Staff verifies site mee TCP closure criteria, then gain <br /> E/ PG's concurrence. On G saved LTCP check list as"FINAL","R Y FOR CLOSURE" in GT. <br /> LOP staff provides list of sites for PG advise CVRWQCB of NFA nsiderations for Unit meeting preparation. <br /> LOP Staff request RP's consultant for GT s ittals of Tri-R tonal Appendix A; Time to reach WQG, initial & <br /> removed mass residuals, radius of influence fr remedi ' n pilot study. RB notified on submittals in GT. <br /> LOP staff, PG/PC discuss NFA and LTCP READY F OSURE consideration with CVRWQCB at Unit Meeting/ <br /> phone/email. RB concurs informally on . R equire to concur w/closure. <br /> v Staff/consultant prepare Public Partici p on Notice (PPN). ff approves final PPN for consultant's use. Mailing <br /> list of effected properties and adjacen roperties recipients (confi tial) and PPN filed in LOP file. PPN uploaded <br /> to GT on PPN sent to city/county Building D t& water purveyor. <br /> Comment period of 60 days be n ; completed ; #o omments recorded in narrative <br /> LOP Staff directs RP to plete CERTIFICATION OF RECORD FEE TITLE OWN FOR PENDING"NO FURTHER <br /> ACTION REQUIRED"( ) form, per Section 25297.15 (a), if one is not in the file. N tive to indicate Staff verified a <br /> completed RTO is ' the LOP file. The NFA closure letter may not be issued withou mpletion of RTO. <br /> LOP Staff s Case Closure Summary(CCS) and CCS is reviewed by 'third party' staff m er: <br /> � LOP aff prepares 30-day notification letter to CVRWQCB of intention to issue an NFA and final sion of CCS. <br /> OP Staff submits 30-day CVRWQCB letter dated w/CCS and file to PC for review and signature. <br /> Response due in 30 days by: Concurrence received on: Extension requested to: <br /> Non-concurrence letter from CVRWQCB Management received on: <br /> Staff uploads EHD letter to CVRWQCB without CCS & CVRWQCB concurrence letter w/check sheet on to G . <br /> LOP Staff directs RP to destroy all MWs, remove all waste material & provide documentation of proper waste <br /> l3 <br /> disposal. LOP staff reviews and approves work plan for MW destructions. Destruction permits issued 11 <br /> (after 60 day PPN period) &Johnny notified of impending work. Destructions scheduled for (Z14- I <br /> tq LOP Staff verifies and documents in narrative the destruction of all MWs. GT"GW Monitoring Frequency" screen <br /> updated to indicate MWs are destroyed. The NFA may not be issued until MWs are destroyed. <br /> om_LOP Staff verifies and documents in narrative that all onsite waste material was removed and properly disposed, <br /> and EHD accounting staff verified that all SR& D site fees have been paid. The NFA may not be issued <br /> IN'w XTu f&c"Imentation. <br /> 31ti�LOP Staff asks clerical to prepare NFA& CCS for Director's signature within 30 days of verifying destruction of <br /> all MWs and receiving documentation waste material was properly disposed. LOP Staff provides clerical the <br /> name and address of all RPS who are to receive an original NFA. <br /> PG/PC reviews NFA, CCS, and narratives for entries documenting all required steps are completed to approve <br /> issuance of NFA letter from the Director. File, NFA, & CCS returned to clerical for Director's signature. <br /> Signed CCS and NFA originals are mailed by clerical to RPs. Clerical distributes copies for LOP Staff to upload to <br /> GT, LOP File, & PC for their records. <br /> Clerical updates Envision records with PE 3528 and Manage Site Mitigation Case/ROP case status/Closed. <br /> /0 / LOP staff pulls all site files for clerical staff to place in LOP Closed File cabinets, until scanned into Questy. <br /> d ,�OP staff updates GT"Project Information" &"Status-Definition" screens to reflect site status as Closed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.