Laserfiche WebLink
Kennedy/Jenks Consultants <br /> sanitary seal composed of approximately 2 feet of bentonite chips topped by cement. The <br /> monitoring well is protected by a flush mount traffic rated cover and locking well cap. <br /> Monitoring well MW-2 was constructed of 2-inch diameter Schedule 40 PVC with 0.010-inch <br /> slotted screen sections from 45 to 60.5 feet bgs. The filter pack consists of#3 sand, and a <br /> sanitary seal composed of approximately 4 feet of bentonite chips topped by cement. The <br /> monitoring well is protected by a locking steel standpipe. <br /> Monitoring well MW-3 was constructed of 2-inch diameter Schedule 40 PVC with 0.020-inch <br /> slotted screen sections from 16 to 36 feet bgs. The filter pack consists of#3 sand, and a <br /> sanitary seal is composed of approximately 2 feet of bentonite chips topped by cement.The <br /> monitoring well is protected by a flush mount traffic rated cover and locking well cap. <br /> Monitoring well MW-4 was constructed of 2-inch diameter Schedule 40 PVC with 0.020-inch <br /> slotted screen sections from 35 to 55 feet bgs. The filter pack consists of#3 sand, and a <br /> sanitary seal is composed of approximately 2 feet of bentonite chips topped by cement. The <br /> monitoring well is protected by a locking steel standpipe. <br /> Monitoring well MW-5 was constructed of 2-inch diameter Schedule 40 PVC with 0.010-inch <br /> slotted screen sections from 50 to 70 feet bgs. The filter pack consists of#3 sand, and a <br /> sanitary seal is composed of approximately 4 feet of bentonite chips topped by cement. The <br /> monitoring well is protected by a flush mount traffic rated cover and locking well cap. <br /> Monitoring well MW-6 was constructed of 2-inch diameter Schedule 40 PVC with 0.020-inch <br /> slotted screen sections from 55 to 75 feet bgs. The filter pack consists of#3 sand, and a <br /> sanitary seal is composed of approximately 2 feet of bentonite chips topped by cement. The <br /> monitoring well is protected by a locking steel standpipe. <br /> Monitoring well MW-7 was constructed of 2-inch diameter Schedule 40 PVC with 0.020-inch <br /> slotted screen sections from 50 to 71 feet bgs. The filter pack consists of#3 sand, and a <br /> sanitary seal is composed of approximately 2 feet of bentonite chips topped by cement.The <br /> monitoring well is protected by a locking steel standpipe. <br /> 4.2.2.2 Groundwater Sampling and Analysis <br /> Monitoring wells are sampled on a quarterly basis. As specified in revised MRP No. 87-184, the <br /> following constituents are analyzed for groundwater monitoring: Nitrate as N, TKN, TDS, pH, <br /> trihalomethanes, and standard minerals including calcium, magnesium, sodium, chloride, <br /> nitrate, sulfate, total alkalinity including the alkalinity series, and hardness. Trihalomethanes and <br /> standard minerals are monitored annually. Groundwater levels are recorded at the time of <br /> sampling. Tables 4 and 12 summarize the groundwater elevation data and analytical data <br /> respectively. <br /> 4.3 Offsite Groundwater Quality <br /> Although treated process water historically has been applied to land at the Facility's vineyards, <br /> other significant sources of the constituents of concern may also exist, such as releases at <br /> neighboring industrial or agricultural sites. Groundwater may also have been affected on a <br /> Groundwater Protection Work Plan, Woodbridge Winery Page 4-3 <br /> Robert Mondavi,Acampo, California <br /> sgma pAw,,3JpU 1231 aa�mcn ac'A�eP'.t5.cvi�i(VUcn v uJrt.hrtdce <br />