My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TENTH
>
150
>
2900 - Site Mitigation Program
>
PR0505598
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 10:25:12 AM
Creation date
7/1/2020 9:43:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505598
PE
2950
FACILITY_ID
FA0006889
FACILITY_NAME
AMERICAN SAVINGS & LOAN
STREET_NUMBER
150
Direction
W
STREET_NAME
TENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23505402
CURRENT_STATUS
01
SITE_LOCATION
150 W TENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Proper lockout/tagout procedures must be employed to prevent injury. <br /> Electrical circuits require special attention. <br /> • Significant amounts of decontamination work must be in restricted work areas <br /> and from ladders, etc. Slips, trips and falls cause serious injury and good <br /> housekeeping is very important. <br /> • Heat stress is a hazard, especially where PPE is required. Use work-rest <br /> regimens and maintain hydration. <br /> Other Requirements <br /> All decontamination operations that involve confined spaces, supplied air, etc., also <br /> require the task specific training. <br /> 7.4 Sampling Activities Safety Guidelines <br /> Hazards/Controls <br /> • When opening drums, check first for pressure. Loosen the retaining ring part- <br /> way and lift lid gently. After insuring that no residual pressure is present, <br /> finish removing retaining ring. <br /> • The need for sampling is often the result of "lack of knowledge" of the <br /> material, implying a somewhat unknown situation. PPE requirements and <br /> handling procedures must address this. <br /> • Some sampling activities require use of special sampling equipment. Persons <br /> using this equipment should be trained prior to performing sampling. <br /> • There is a concern of punctures and cuts. Special protective equipment will <br /> be required. <br /> • Heat stress is a hazard, especially where PPE is required. Use work-rest <br /> regimens and maintain hydration. <br /> 8.0 PERSONAL PROTECTIVE EQUIPMENT (PPE) <br /> Based on information gathered during the review of property records and historical research, <br /> the appropriate starting level of PPE for this project is Level D. <br /> 8.1 Level D Protection <br /> The minimum ensemble (Level D) for work zone and decontamination work is as <br /> follows: <br /> CRC Environmental Risk Management,Inc. Project No.2100-217-2 <br /> American Savings Bank 150 West 10th Street <br /> February 15. 1995 15 Tracy,California <br />
The URL can be used to link to this page
Your browser does not support the video tag.