My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TENTH
>
150
>
2900 - Site Mitigation Program
>
PR0505598
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 10:25:12 AM
Creation date
7/1/2020 9:43:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505598
PE
2950
FACILITY_ID
FA0006889
FACILITY_NAME
AMERICAN SAVINGS & LOAN
STREET_NUMBER
150
Direction
W
STREET_NAME
TENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23505402
CURRENT_STATUS
01
SITE_LOCATION
150 W TENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.6 Work Zones Access <br /> Access within a five-foot radius of any on-site operation is prohibited to all but <br /> authorized CRC field personnel and subcontractors. <br /> 14.7 Emergency Equipment <br /> Vehicles used for site work will be equipped with a first aid kit and safety equipment <br /> including: <br /> ♦ fluorescent cones <br /> ♦ flags (as needed) <br /> ♦ barricades (as needed) <br /> ♦ fire extinguisher (dry chemical ABC-type extinguisher) <br /> ♦ flashlight <br /> ♦ water, suitable for drinking <br /> ♦ appropriate emergency bandage material <br /> 14.8 Drilling Procedures <br /> A Dig-Alert authorization number must be obtained prior to drilling. <br /> During the drilling operation, two persons (one designed as "driller" and the other as <br /> "helper") must be present at all times. The helper (whether CRC personnel or <br /> subcontractors) must be instructed as to the location of the emergency shut-off switch. <br /> Every attempt must be made to keep unauthorized personnel from entering the work <br /> area. If this is not possible, the operation should be shut down until the area is <br /> cleared. The area where the operation is taking place shall be cordoned off with a <br /> barricade. The FSS or the PM has the authority and the responsibility to shut down <br /> the drilling operations whenever a hazardous situation is deemed present. <br /> The mast of the drilling rig must maintain a minimum clearance of 20 feet from any <br /> overhead electrical cables. All drilling operations will cease immediately during <br /> hazardous weather conditions such as high winds, heavy rain, lightening and snow. <br /> Hard hats shall be worn at all times. Hearing protection shall be worn during noisy <br /> operations. <br /> If product is encountered during the drilling operation, all work must stop in order for <br /> employees to upgrade personal protective equipment to Level C. A full-face respirator <br /> should be worn in order to prevent the inhalation of vapors and to provide face and <br /> eye protection from splashes. Coated tyvek suits, gloves and overboots should be <br /> worn to prevent skin contact with the soil. <br /> CRC Environmental Risk Management,Inc. Project No.2100-217-2 <br /> American Savings Bank 150 West 10th Street <br /> February 15, 1995 30 Tracy,California <br />
The URL can be used to link to this page
Your browser does not support the video tag.