My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SPRECKELS
>
321
>
2200 - Hazardous Waste Program
>
PR0521786
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 2:55:32 PM
Creation date
7/1/2020 1:22:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521786
PE
2227
FACILITY_ID
FA0014792
FACILITY_NAME
J M EQUIPMENT COMPANY INC
STREET_NUMBER
321
STREET_NAME
SPRECKELS
STREET_TYPE
AVE
City
MANTECA
Zip
95336-6007
APN
22125020
CURRENT_STATUS
01
SITE_LOCATION
321 SPRECKELS AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti VI : i I Occupants <br /> If a disabled occupant is unable to exit the building unassisted , the Safety Monitor must notify the emergency <br /> response personnel of the person ' s location . Transporting of disabled individuals up or down stairwells should <br /> be avoided until emergency response personnel have arrived . Unless imminent life -threatening conditions <br /> exist in the immediate area occupied by a non - ambulatory or disabled person, relocation of the individual <br /> should be limited to a safe area on the same floor, in close proximity to an evacuation stairwell . <br /> Section VII : Critical Operations Shutdown <br /> Critical Operation Shutdown : Critical operations, including equipment that must be shut off and persons <br /> designated to complete these actions are identified in Appendix I of the EEP . Procedures for rapid shutdown <br /> should be predetermined for life safety and loss control purposes , as well as ensuring complete evacuations in <br /> a timely manner . <br /> The Critical Operations Shutdown procedure to be followed by those employees who have been assigned to <br /> care for essential building operations include . <br /> I e.A E <br /> Er I D <br /> Operation Responsibility <br /> MAR 0 2 2016 <br /> 1 . Electrical Circuits Rowie Sizemore <br /> ENVIRONMENTAL <br /> HF AITH nPPA PT- Ar, air <br /> 2 . LP Fuel Systems Manuel Pereira <br /> 3 . Natural Gas Scott Dahlgren <br /> Persons involved in the Critical Operations Shutdown listed above shall be notified by management of this responsibility <br /> in advance , identified in the EEP, and wilt be appropriately trained for the particular situation . Personnel assigned to <br /> critical operations responsibilities are listed in Appendix L <br />
The URL can be used to link to this page
Your browser does not support the video tag.