Laserfiche WebLink
2.0 BACKGROUND <br /> engineers, a project scientist,and a project manager. CCI personnel included a construction <br /> project manager,an on-site construction manager,and a site safety officer. <br /> Subcontractors to CCI for the performance of the remedial work included: <br /> • EM Assist, Inc.—demolition,excavation,backfill,final grading,and restoration. <br /> • APPL Laboratories, Inc.—analytical laboratory for soil testing. <br /> In addition,UPRR provided a rail line flagman at the railroad crossing. <br /> Subcontractors to PG&E for performance of the remedial work included: <br /> • DenBeste Transportation—transportation of soil to Forward Landfill. <br /> • Forward Landfill-disposal facility for the petroleum hydrocarbon affected soil. <br /> SFO1(THORNTON COMPLETION REPORT_6-21-05.DOC) 2-2 <br />