My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SPERRY
>
1051
>
4400 - Solid Waste Program
>
PR0504217
>
COMPLIANCE INFO_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 11:49:01 AM
Creation date
7/3/2020 10:35:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992
RECORD_ID
PR0504217
PE
4430
FACILITY_ID
FA0004231
FACILITY_NAME
J M EAGLE (WS)
STREET_NUMBER
1051
STREET_NAME
SPERRY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17728039
CURRENT_STATUS
02
SITE_LOCATION
1051 SPERRY RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0504217_1051 SPERRY_1992.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br />Post Phase: <br />After asbestos in runoff and channel surface water has been controlled to meet the water <br />quality goal, surface water monitoring at the four surface water monitoring points (SW -1 <br />through SW -4) will occur for a period of five years. One round of samples will be collected <br />each year. The samples will be collected during the first significant storm event of the wet <br />season. If after 5 years it appears that asbestos in surface water has been controlled, 7-M Mfg. <br />will request that the requirement for surface water monitoring be dropped. <br />6.5.2 Ground Water <br />"` Two rounds of ground water samples were collected as part of the SWAT investigation. This <br />monitoring indicated that there were little if any ground water impacts. Kleinfelder proposes <br />that after the WMUs are capped, the SWAT sampling be repeated (two rounds of sampling <br />over one year, analysis for VOCs, metals and general minerals). If these results are consistent <br />with the SWAT sampling results, the four monitoring wells would be destroyed and ground <br />water sampling would cease. <br />6.6 CLOSURE SCHEDULE <br />"' Table 6-2 shows the closure schedule for the activities described in this report. Note that <br />0 <br />L <br />D <br />implementation of the different phases of the drainage plan must occur over a span of years <br />because the decision of whether to implement a phase is dependent on an assessment of the <br />performance of the preceeding phase. <br />CR14-92-12 Page 37 of 39 24-220109-1709 <br />Copyright 1992 Kleinfelder, Inc. <br />LJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.