Laserfiche WebLink
STATE OF CALIFORNIA GEORGE DEUKMEJIAN,Governor <br /> CALIFORNIA REGIONAL WATEWUALITY CONTROL BOARD— <br /> CFURAL VALLEY REGION <br /> 3443 ROUTIER ROAD a <br /> SACRAMENTO,CA 95827-3098 <br /> ® 1��a <br /> juN 1 <br /> 9 June 1988 <br /> V\R® r�,s� R�\GES <br /> Dr. E. E. Wang, Manager <br /> Corporate Environmental Control <br /> J-M Manufacturing Company, Inc. <br /> 1051 Sperry Road <br /> Stockton, CA 95206 <br /> PERMIT REQUIREMENTS FOR J-M MANUFACTURING SITE CLOSURE <br /> In your 22 February and 2 May 1988 letters you ask if permits are <br /> required for the subject site. Waste discharge requirements are <br /> required for closure of the surface impoundments and landfill at <br /> this site, and for the continued discharge of water from the PVC <br /> pipe manufacturing process to the disposal pond. <br /> We received a report of waste discharge and a filing fee from <br /> this facility dated 16 January 1986. Additional information in <br /> the form of a report titled '"J- A/C PIPE CORPORATION REPORT OF <br /> DISPOSAL SITE INFORMATION" was received on 17 March 1986. This <br /> information was not sufficient to formulate waste discharge <br /> requirements for this facility. A letter and a memorandum <br /> detailing the additional information requirements was sent by <br /> this office on 21 October 1987 to Mr. Terry Lohman. I discussed <br /> this memorandum with you by phone on 6 June 1988. <br /> As we discussed, your site is subject to the following <br /> regulations: <br /> 1. ONGOING DISCHARGE <br /> The ongoing discharge of PVC pipe process water to the <br /> disposal pond must be regulated by waste discharge <br /> requirements, <br /> 2. SOLID WASTE LANDFILL <br /> Section 13273 of the Water Code requires that operators <br /> of solid waste disposal sites submit a solid waste <br /> water quality assessment test (SWAT) to the appropriate <br /> regional board. As we discussed the SWAT report must <br /> be prepared by a qualified person. Qualifications are <br /> discussed in. Section 13273 . A copy is enclosed for <br /> your infonuation. Our 21 October 1987 memorandum notes <br /> that the SWAT report workplan for your site is due by <br /> 1 April 1989. The report is due by July 1990, Waste <br /> discharge requirements must also be written for the <br /> landfill operation. <br />