kn KLEINFELDER <br /> 2.2 PREPARE A REPORT OF FINDINGS <br /> Upon completion the field work, a soil assessment report of findings will be prepared for client <br /> review. The report will include: <br /> > A description of field activities, observations, and protocols. <br /> > Illustrations and color photographs documenting field conditions. <br /> > A discussion of findings regarding the composition and extent of debris and <br /> recommendations for additional investigation, if any, and the significance of the findings <br /> relative to the proposed approach to closure. <br /> 2.3 SCHEDULE <br /> Once regulatory approval of the workplan is obtained, field work will begin within 2 weeks <br /> (assuming that an excavator and operator will be available in that time frame). The actual field <br /> work will take 1 day. The final report will be prepared within 3 weeks of completion of the field <br /> investigation. <br /> 23-4824150-Aoo/CR96S052 Page 5 of 7 June 7, 1996 <br /> Copyright 1996 Kleinfelder,Inc. <br />