Laserfiche WebLink
T <br /> Mr. Robert McClellon <br /> October 31, 2007 <br /> Page 2 <br /> In December 2005, a vapor extraction pilot test was conducted to evaluate the feasibility of installing a <br /> permanent landfill gas extraction system. During this test,vapor samples were collected from the two <br /> extraction wells and analyzed for volatile organic compounds(VOCs). Analytical results of these <br /> samples confirmed the presence of VOCs where the total VOC concentration in each of the vapor <br /> extraction wells was less than 5 ppmv.Based on these results,VOC constituents could be present in <br /> groundwater.To assess the presence or absence of VOC constituents in the groundwater,three ground- <br /> water monitoring wells were installed at the site on June 12,2006. Following the installation of the <br /> groundwater monitoring wells, groundwater samples have been collected quarterly and analyzed for <br /> VOCs. In a meeting on May 24, 2007,Mr. Ross Atkinson of the Regional Water Quality Control Board <br /> (RWQCB) Central Valley Region concurred with the recommendation in the Quarterly Monitoring <br /> Report dated April 30, 2007, to suspend the groundwater monitoring activities for VOCs.As per <br /> Mr. Atkinson's request, groundwater samples have been collected and analyzed for metals and general <br /> minerals(only total dissolved solids [TDS] after the first event)since the fourth quarter of 2006. <br /> FIELD ACTIVITIES <br /> The following two sections describe the monitoring activities completed during the third quarter of 2007 <br /> and the removal activities for the excess passive soil vapor extraction trench material completed during <br /> the week ending September 28,2007. <br /> Quarterly Monitoring Activities <br /> During the third quarter of 2007, landfill gas concentrations were measured within the gas-migration <br /> monitoring probes,extraction wells, and passive vents every month. The quarterly groundwater <br /> monitoring activities were completed on September 20,2007. <br /> Using a handheld portable landfill gas monitor,each gas-migration monitoring probe, each extraction <br /> well,and each passive vent was measured for methane,oxygen,and carbon dioxide. These measure- <br /> ments were recorded in a field log book. <br /> Groundwater samples were collected from the three monitoring wells using the following procedures: <br /> • The water level from each monitoring well was measured using an electronic water level sounder. <br /> • Prior to groundwater sample collection, each well was purged using a bailer.During purging, <br /> groundwater parameters(pH,temperature,and conductivity)were recorded on the Monitoring Well <br /> Sampling Data form(Attachment 1)at least once per well casing volume. Purging was completed <br /> when the groundwater parameters had stabilized to within 10 percent. The purged water was placed <br /> in 55-gallon drums. <br /> • A groundwater sample, collected from each well using a bailer was placed into the analytical <br /> laboratory-prepared sample containers. <br /> K:\Wprocess\25532\WorldEnterprise\Quarterly Rpt\2007\3Q07\103107.doc <br />