My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1989-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 9:40:02 AM
Creation date
7/3/2020 10:39:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-1996
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1989-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> availability time frame. <br /> 21) Page 14; construction sequencing, provide information <br /> as required by PDM page 3 . 1-36. <br /> 22) Appendix H, page 11. 35; Maximum slope on closure is <br /> stated to be 4: 1, this seems to conflict with the <br /> maximum slope of 3 : 1 in RDSI. Please clarify. <br /> 23) Page 15; provide a map delineating intermediate cover <br /> areas, (pg 3 . 1-40 PDM) . <br /> 24) Page 15; If soil is to be imported, were will it come <br /> from? (pg 3. 1-42 PDM) . <br /> 25) Page 16; States "No volume reduction proposed" , however <br /> P-2 shows a future composting area. Provide <br /> information on such a proposal (pg 3 . 1-45 PDM) , or <br /> remove from map. <br /> 26) Page 16; Potable water, well is a source. Include as <br /> "adequate supply" (14 CCR 17667) . <br /> 27) Page 16; Describe audio, visual, and automatic <br /> communications systems utilized and emergency <br /> communications procedures followed at this site (3. 1-46 <br /> PDM; 14 CCR 17668) . <br /> 28) Page 16; Lighting, statement is incorrect. Winter <br /> morning operations are generally conducted prior to day <br /> light hours. Address safety concerns on roadway and <br /> site operations. <br /> 29) Page 16; Safety Equipment Section states: "The <br /> operations manager checks out all personnel before they <br /> go to work to ensure they have all their safety <br /> equipment on and that it is in good working order. " If <br /> this is not the case please revise in this document. <br /> 30) Page 16; Leachate, FDSR page 11, Leachate collection <br /> facility, show details. How will leachate be stored, <br /> ponds, tanks? <br /> 31) Page 17; Treatment and disposal. If leachate is <br /> discharged to a sewage treatment plant, written <br /> permission from the receiving treatment plant shall be <br /> included (pg 3 . 1-53 PDM) . <br /> 32) Page 18; Vadose zone monitoring system, what means of <br /> monitoring will be used, lysimeters? <br /> 33) Page 18; "Response column", fourth box down, type-ols <br /> "Report-ing" , and page 19, first box down, I'meth-ods" <br /> and "expan-sion" , correct. <br />
The URL can be used to link to this page
Your browser does not support the video tag.