Laserfiche WebLink
Y py <br /> 7) Page 7; stockpiling, plan to store excavated soil, plan <br /> says "most", what will be done with the rest? <br /> 8) Page 8; map scales are not correct for P-1, P-2, P-3 , <br /> P-4, and P-5. <br /> 9) Page 8; Fill sequencing, P-3, drawing scale 111 = 4001 , <br /> map detail and numbers are unclear, provide a more <br /> appropriate scale, (at least 101 = 2001 ) . <br /> 10) Page 8; show degree of slope between benches (pg 3 .1-23 <br /> PDM) on map P-1. <br /> 11) Page 8; P-3, maps are to small to see detail, provide <br /> maps of appropriate size and scale. <br /> 12) Page 8; leachate collection detail shown on P-6, not P- <br /> 7. Correct. <br /> 13) Page 8; Gas management plan, not given as required (pg <br /> 3 . 1-26, PDM) . Provide. <br /> 14) Page 5; Appendix E, /1 . . .additional geotechnical <br /> investigation work to be conducted prior to final <br /> design of the vertical expansion. . . ", Make this <br /> statement in the table, up front. <br /> 15) Page 10; seismic stability not required? explain. <br /> 16) Page 11; settlement analysis calls for further studies, <br /> Appendix E pg 5. How can approval be given on future <br /> study to proceed on unknown facts for the vertical lift <br /> in the final phase? <br /> 17) Page 11; climatological data used for /'leachate model" <br /> is 20 years old, 1974-1978. More current information <br /> should be used. Last year and this year water was <br /> above the access roads, and in contact with toe of <br /> landfill. In addition current drainage system does not <br /> move run-off away from landfill. Will this be the case <br /> in the expansion? What steps will be taken to correct <br /> current and future problems? <br /> 18) Page 13 ; describe the responsibilities of each <br /> supervisor (14 CCR 17673 ; pg. 3. 1-33 PDM) . <br /> 19) Page 13 ; List equipment by type, capacity and numbers <br /> (14 CCR 17693 , pg. 3 . 1-34 PDM) . <br /> 20) Page 13; stand-by equipment, provide a list of firms or <br /> agencies which can supply replacement units (14 CCR <br /> 17694; pg 3 . 1-35 PDM) , provide names, phone Ps, <br />