t 103 <br /> SOLID WASTE FACILITY PERMIT APPLICATION - AUSTIN ROAD LANDFILL SITE <br /> 1• <br /> Item #1. The Austin Road landfill is a Class "II-2 site operated <br /> 1. <br /> by the separate trench method; a distance of 28 feet from center <br /> to center is maintained between trenches . A daily cover of six <br /> inches is applied at the end of each working day thus forming <br /> cells. The final cover is three feet in depth. Excavation of <br /> new trench is kept as close to the working face as possible to <br /> facilitate application of a daily cover as soon as possible after <br /> compaction. Excavation is performed with a hydraulic excavator. <br /> ' All required cover material is available on the site.. - <br /> Cell width is the same as the trench spacing, 28 feet, and <br /> runs the full width of the landfill site, varying from 1 ,000 <br /> to 2, 600 feet. Compaction is accomplished with a compactor work- <br /> ing four to six hours daily. A typical cycle is difficult to <br /> describe because the same operator operates the push tractor and <br /> the compactor, with the operator of the excavator helping with <br /> both the push tractor and the compactor when he has time avail- <br /> able. Compaction to 1,000 pounds per cubic foot is the minimum <br /> accepted in place density. <br /> a. <br /> A. The normal hours of operation are between 6 : 30 a.m. and <br /> 4 : 30 p.m. each day except Saturday`­,and Sunday. The hours of <br /> operation on Saturday are 6 : !5D a.m. to 1 : 30 p.m. The site is <br /> closed Sundays , Christmas `Day and NeV-.Y'ear' s Day. <br /> B There are <br /> -- - at the <br /> landfill site. �7 <br />