Laserfiche WebLink
Periodic Site Review <br /> 4 of 4 <br /> Engineered environmental controls include, but are not <br /> limited to, the following: (consider each one separately) <br /> 1. Gas monitoring and control system <br /> 2. Leachate monitoring, control and treatment systems <br /> 31. Holding ponds for liquids <br /> 4 . Drainage/erosion control system <br /> 5. Revegetation/reclamation of final surfaces <br /> G. Other (specify) <br /> Summary of Recommendation and Conclusions <br /> Have all problem areas at the facility been identified with <br /> respect to site design, operation and engineered environmental <br /> controls? Have recommendations been made for workable solutions <br /> to improve the problem. areas? Are these solutions consistent <br /> with current CWMB regulations, technology, other regulatory <br /> agency regulations, site conditions (climate, geography, geology, <br /> etc. ) , and the actual capability of the operator to carry Out the <br /> recommendations? Do conclusions specify why certain methods were <br /> recommended to improve the site conditions? <br /> If the current design and operation of the facility do not <br /> adversely affect the environment, public health or safety, do the <br /> conclusions specify reasons for this determination? <br /> In summary, the purpose of the Periodic Site Review is to assure <br /> that all conditions at a landfill have been evaluated with <br /> respect to the environment, public health and safety. The <br /> engineer then makes recommendations to enhance site conditions <br /> based on conclusions developed during the review. If no <br /> recommendations for site improvements are necessary, the engineer <br /> will document the reasons for this conclusion. <br /> April 1989 <br />