My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1989-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 9:40:02 AM
Creation date
7/3/2020 10:39:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-1996
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1989-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r w. <br />September 26, 1990 <br />William J. Marshall, Chief <br />Waste Discharge to Land Unit <br />California Regional Water Quality Control Board <br />Central Valley Region <br />3443 Routier Road, Suite A <br />Sacramento, CA 95827-3098 <br />Attn: Jeffrey K. Tucker, Project Engineer <br />CITY OF STOCKTON AUSTIN ROAD LANDFILL INTERMEDIATE GRADING PLAN <br />Attached for your review and comments, please find two (2) sets of topo <br />maps, cross-sections, and calculations for the Austin Road Landfill <br />intermediate grading plan as required by the Amended Waste Discharge <br />Requirements, Order No. 90-122. <br />As you can see Phase I, operation of this plan is to concentrate on <br />filling and covering the highly impacted area of the landfill to the <br />proposed intermediate grade. It will take roughly 155 working days to <br />complete this phase, assuming the present 512 tons per day maximum <br />allowable capacity continues. <br />Phase II and Phase III of the operation will take roughly 121 working <br />days and 40 working days to complete. <br />The City intents to implement this plan immediately after receiving <br />your approval. I would like to take this opportunity to thank Mr. <br />Tucker, for his assistance in developing this concept. <br />If you have any questions please call me at 944-8341. <br />STEPHEN CHEN <br />DEPUTY PUBLIC WORKS DIRECTOR/STREETS <br />SC: sl <br />cc: Phil Giambastiani, Owner/Operator of Austin Road Landfill <br />Edward Padilla, Senior REHS Enviornmental Health Division <br />Pacific Energy: Attn Alex Roqueta, Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.