Laserfiche WebLink
e <br />4. Details for the intermediate cover to be placed on the <br />existing fill area. Include details and description of the <br />construction methods for the placement of the geomembrane <br />and gas extraction wells in this area, methods for <br />collecting gas beneath the geomembrane to prevent ballooning <br />of the geomembrane and slope stability calculations for the <br />geomembrane cover system. <br />If you have any questions regarding the review process please <br />contact me at (916) 255-3838'or Scott Walker at (916) 255-1198. <br />Respectfully, <br />;?�w "Z& 45�- <br />Timothy W. Crist, P.E. <br />Closure and Remediation Branch <br />Permitting and Enforcement Division <br />TWC:twc:\sanjoaq\austrd\cmtlt26.doc <br />cc: Al Olden, Public Health Services, Environmental Heath <br />Division, San Joaquin County <br />