My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1991-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 10:53:56 AM
Creation date
7/3/2020 10:39:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-1997
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1991-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w , <br /> GWADC Clarification <br /> Page 3 of 4 <br /> (Note: Prior to final approval of the Project all wet weather problems for which the use <br /> of the tarp was previously failed must be addressed.) <br /> LACK OF GWADC <br /> Tonnage of green waste has decreased to a point that total cover of waste cannot be <br /> accomplished. Evaluation of consistent GWADC performance over a typical daily cell <br /> of waste has not always been possible. In order to monitor cover performance, <br /> quantities of GWADC must be adequate to cover a cell-size area over a period of time <br /> and during different weather conditions. <br /> If COS intends for the Project demonstration evaluation to continue or needs to <br /> temporarily curtail the EHD evaluation, a plan addendum is required. This plan <br /> should explain the shortage problem, how COS plans to provide for daily waste cover <br /> during shortages, and how EHD evaluation of GWADC will be facilitated. <br /> (Note: Prior to final Project approval, wet weather concerns due to shortage of <br /> GWADC shall be addressed). <br /> PONDING AT FRENCH CAMP LANDFILL {FCL <br /> Ponded water over intermediate cover fill areas is a violation of CCR, Title 14. <br /> Ponding has been indicated as a problem on inspection reports several times during <br /> the past rainy season. Corrective action for ponding is required and would include <br /> draining or pumping ponds and/or filling in ponds with soil. Proper grading of <br /> intermediate cover areas during drier weather will be required before the next rainy <br /> season to prevent wet weather ponding problems. Since the grading plan in the <br /> February 1993 RDSI is outdated and the average daily tonnage is greatly reduced, a <br /> revised grading plan is required. <br /> All observed ponding will be cited on inspection reports by EHD. <br /> CONCLUSION <br /> Violations of any CCR, Title 14 standards (litter, erosion, lack <br /> of adequate soil stockpile, inadequate intermediate cover thickness, grading, etc.) will <br /> be cited as an area of concern or violation depending on the discretion of the <br /> inspector. <br /> Criteria for issuing a violation or "area of concern" includes the severity and/or the <br /> chronic nature of a problem. Two consecutive, monthly violations for the same <br />
The URL can be used to link to this page
Your browser does not support the video tag.