Laserfiche WebLink
c: <br />LI <br />A68102-01 Page B-4 <br />2. Boot covers and coveralls will be removed and coveralls placed in a plastic bag for <br />appropriate disposal. <br />3. Gloves will then be removed and placed in the plastic bag; hands will be washed with <br />soap and water. <br />4. Spent protective clothing will be stored on-site in 55 -gallon drums and properly <br />disposed of after receipt of laboratory analyses. <br />Person Responsible for Health and Safety at Site: Twining's project geologist will be the <br />designated site safety officer. The project geologist's responsibilities will include <br />implementation of the site safety work plan for Twining personnel involved with field <br />operations. Project geologist have completed 40 -Hour OSHA Health and Safety Training <br />and the annual 8 -hour refresher training as required by 29 CFR 1910.120. <br />The project safety officer will oversee the administration of the site safety work plan. The <br />project manager is hereby designated as the project safety officer. The project manager <br />have completed 40 -Hour OSHA Health and Safety Training, 8 -Hour Update, and 8 -Hour <br />Supervisors' Health and Safety Training as required by 29 CFR 1910.120. <br />