My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1991-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 10:53:56 AM
Creation date
7/3/2020 10:39:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-1997
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1991-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c: <br />LI <br />A68102-01 Page B-4 <br />2. Boot covers and coveralls will be removed and coveralls placed in a plastic bag for <br />appropriate disposal. <br />3. Gloves will then be removed and placed in the plastic bag; hands will be washed with <br />soap and water. <br />4. Spent protective clothing will be stored on-site in 55 -gallon drums and properly <br />disposed of after receipt of laboratory analyses. <br />Person Responsible for Health and Safety at Site: Twining's project geologist will be the <br />designated site safety officer. The project geologist's responsibilities will include <br />implementation of the site safety work plan for Twining personnel involved with field <br />operations. Project geologist have completed 40 -Hour OSHA Health and Safety Training <br />and the annual 8 -hour refresher training as required by 29 CFR 1910.120. <br />The project safety officer will oversee the administration of the site safety work plan. The <br />project manager is hereby designated as the project safety officer. The project manager <br />have completed 40 -Hour OSHA Health and Safety Training, 8 -Hour Update, and 8 -Hour <br />Supervisors' Health and Safety Training as required by 29 CFR 1910.120. <br />
The URL can be used to link to this page
Your browser does not support the video tag.