My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1996-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 8:55:58 AM
Creation date
7/3/2020 10:39:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2003
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
623
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO. R5-2003-0049 10 <br /> FORWARD INC. AND ALLIED INDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS II LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 6. Facility Monitoring <br /> a. Facility Inspection <br /> Annually,prior to the anticipated rainy season,but no later than <br /> 30 September, the Discharger shall conduct an inspection of the facility. <br /> The inspection shall assess damage to the drainage control system, <br /> groundwater monitoring equipment(including wells, etc.), and shall <br /> include the Standard Observations contained in section F.4.f. of Order No. <br /> R5-2003-0049. Any necessary construction, maintenance, or repairs shall <br /> be completed by 31 October. By 15 November of each year, the <br /> Discharger shall submit an annual report describing the results of the <br /> inspection and the repair measures implemented, including photographs of <br /> the problem and the repairs. <br /> b. Storm Events <br /> The Discharger shall inspect all precipitation, diversion, and drainage <br /> facilities for damage within 7 days following major storm events. <br /> Necessary repairs shall be completed within 30 days of the inspection. <br /> The Discharger shall report any damage and subsequent repairs within 45 <br /> days of completion of the repairs, including photographs of the problem <br /> and the repairs. <br /> 7. Incoming Waste Monitoring <br /> The Discharger shall monitor all wastes discharged to the Class II landfill units, land <br /> treatment unit, landfills and waste piles on a monthly basis and report as follows: <br /> Parameter units Reporting Frequency <br /> Quantity Discharged: <br /> Nonhazardous solid waste Cubic yards Quarterly <br /> Asbestos Cubic yards Quarterly <br /> Sewage and Wastewater Gallons Quarterly <br /> Treatment Sludges <br /> Average % Solids % Quarterly <br /> Where Discharged -- Quarterly <br /> Source of Waste -- Quarterly <br /> Minimum Elevation of Feet & Tenths, Quarterly <br /> Discharge (MSL) <br /> Remaining Capacity of unit % Annually <br />
The URL can be used to link to this page
Your browser does not support the video tag.