Laserfiche WebLink
• , • • <br /> GUR <br /> The landfill did not operate after October 1999, and the scalehouse operations office and other <br /> buildings were not occupied during 2000. These areas were not sampled for landfill gas. <br /> Soil-gas monitoring is scheduled to be conducted during the first quarter of 2001. <br /> If you have any questions, please call me at (510) 652-4500. <br /> Sincerely, <br /> 6 _,� Xet . <br /> Andrew M. Lojo, R.G., Senior Geologist <br /> Enclosures <br /> cc: <br /> Butch Stefani, Forward Landfill <br /> Lochlin Caffey, Allied Waste Industries <br /> Itr-Austin_Road-soH_gas-4Q2000-07979:FNC 2 <br />