Laserfiche WebLink
IJtBB'iDC Pg. b <br /> In the meantime when greenwaste cover is insufficient, soil cover <br /> will be used as specified in the approved GWADCP plan. <br /> One of the requirements in the GWADCP plan is for the landfills <br /> to be completely covered with soil every 21 days (green waste ADC <br /> and all) . Operator exceeded this date at ARL but complied <br /> immediately when directed to cover with soil by the inspector. <br /> The operator was referred to the Winter Plan and GWADCP plan for <br /> approved procedures. <br /> Adjustments have been made regarding traffic flowandoperations <br /> at FCL to increase site safety. The grinding area was <br /> reorganized to allow more room for traffic and a safer location <br /> for headquarters. Grinding area congestion has been minimized. <br /> SUMMARY & MONITORING STATUS: <br /> Overall the project appears to be working successfully. Except <br /> for the shortage problem mentioned above the shredded green <br /> waste appears to make a good daily cover. The problems occurring <br /> with the project are minimal and are being addressed within a <br /> reasonable time frame. <br /> Since vectors have not been a problem weekly fly grill surveys <br /> will be discontinued. Should vectors be observed during monthly <br /> or weekly inspections fly grill studies will be continued. <br /> Project monitoring will continue weekly. All inspection reports <br /> are included with this report for your review. <br /> Contact Carol Oz, Senior R.E.H.S. if you have questions. <br /> Ernest M. Fujimoto, MD, MPH <br /> Acting Health Officer <br /> S <br /> Mike Huggins, Supervisor <br /> Environmental Health Division <br /> CC: Mike Miller, COS <br /> Phil Giambastiani, Gambi Enterprises <br /> Arnold Inouye, CRWQCB <br /> Attachments <br />