Laserfiche WebLink
III.A.5. Surface Drainage Plans 14 CCR 182220) Final surface water drainage plan is shown on Drawing P1, Appendix B, <br /> Drawings P7, P8, and P9 show surface water drainage CEP Dwg. P1, <br /> details. CEP Dwg. P6, <br /> CEP Dwg. P7, <br /> CEP Dwg. P8 <br /> III.A.6. Site Access Plan 14 CCR 17680 Site access from Austin Road and entrance gate shown on Appendix B, <br /> Drawing P1, road surfacing, road dimensions, turnarounds, CEP Dwg. P1 <br /> and stacking lanes to be determined at final design. <br /> See RDSI Section VI.K. for Traffic Control. <br /> III.A.7. Gas Management Plan 14 CCR 18222(m) Currently, a portion of the existing landfill has an active Appendix I, FDSR <br /> extraction system operated by Pacific Energy used to operate Sec. 1.7, Pages 1-28 <br /> an electrical generation plant located on facility property. The to 1-29 <br /> Pacific Energy facility is shown on Drawing P1. It is proposed Appendix B, <br /> that future expansion areas use an active type extraction CEP Dwg. P1, <br /> system using a system of gas extraction wells and/or CEP Dwg. P8, <br /> collection trenches. A conceptual gas plan by phase CEP Dwg. P9, <br /> development is shown on Drawings P9 and P10. CEP Dwg. P10 <br /> III.A.8. Groundwater Monitoring 14 CCR 18222(1) The current groundwater monitoring program is contained in Appendix K, Water <br /> Plan Order No. 96-175, Waste Discharge Requirements For City of Discharge <br /> Stockton Austin Road Landfill Facility issued by the California Requirements, Order <br /> Regional Water Quality Board. Revisions to the groundwater No. 96-175 <br /> monitoring program will require amendments to the RDSI. Appendix B, <br /> CEP Dwg. P1 <br />