My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
ARCHIVED REPORTS_1996_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 10:40:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996_2
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III.A.9. Representative Cross Five representative landfill cross sections are shown on Appendix B, <br /> Sections Drawing P5. These sections show the existing landfill, the CEP Dwg. P5 <br /> vertical and horizontal expansion phases, and the final landfill <br /> grade. Sections A, B, C, and D are cut north-south through a <br /> leachate collection trench and sump for Phases I, ll, III, and IV <br /> respectively. Section F is cut east-west through Phases I, ll, <br /> III, and IV showing the drainage slope to the leachate <br /> collection trenches, the top of the landfill is shown as a <br /> projection beyond the section cut. <br /> Sections show specific design elements of the liner, leachate <br /> collection system, cover system, surface water system are <br /> discussed in Section 1- below. <br /> III.A.10. Design Details 23 CCR 2542 (Liner Liner System: Liner system is a composite liner consisting of Appendix B, <br /> System) a 2 foot clay liner(max. permeability 1 x 10-7 cm/sec) overlaid CEP Dwg. P6 <br /> by a geomembrane. For final design, a geosynthetic clay liner Appendix I, FDSR <br /> (GCL) may be substituted for the 2 foot clay liner. See Sec. 1.3.3, Pages <br /> Drawing P6 for typical liner details. 1-8 to 1-9 <br /> 14 CCR 17773, Final Cover - Existing Landfill: Final covering existing landfill Appendix B, <br /> 23 CCR 2581 (Final Cover) areas would consist of a 2-foot foundation layer and a 1-foot CEP, Dwg. P6 <br /> minimum soil barrier (max. permeability 1 x 10-6 cm/sec) with Appendix I, FDSR <br /> • a 1-foot minimum topsoil layer. Sec. 1.5.3 Page 1-17 <br /> Final Cover - Expansion Landfill: Final cover for expansion <br /> landfill areas will consist of a composite cover system an 18 <br /> inch foundation layer (max. permeability 1 x 10-6 cm/sec), a <br /> geomembrane, and an 18 inch soil cover layer. For final <br /> design, a geosynthetic clay liner (GCL) may be substituted for <br /> the low permeability foundation layer or the soil barrier layer. <br /> See Drawing P6 for typical cover details. <br />
The URL can be used to link to this page
Your browser does not support the video tag.