My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
ARCHIVED REPORTS_1996_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 10:40:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996_2
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 CCR 17776 (Drain Drain System: Drainage layer would be either drainage sand Appendix B, <br /> System) or geocomposite type drain net (drain net with geotextile filter). CEP Dwg. P6 <br /> If a drain net is used, a minimum 1 foot thick soil layer would Appendix I, FDSR <br /> be placed over drain net for protection of the liner system. Sec. 1.3.5, Page 1- <br /> See Drawing P6 for typical details. 10 <br /> 14 CCR 17781(c)(1 (A) Leachate Collection System: The leachate collection consists Appendix B, CEP <br /> (Leachate Collect) of a series of gravel filled trenches with a 6-inch minimum Dwg. P6 <br /> diameter collection pipe. The trenches grade down to a Appendix I, FDSR <br /> collection sump area. The leachate is pumped out of the Sec. 1.3.6 and 1.3.7 <br /> collection sump by a submerged pump to perimeter Pages 1-10 to 1-11 <br /> forcemain. See details 7, 8, and 9 Drawing P6 and FDSR <br /> section 1.3.6 and 1.3.7. <br /> 14 CCR 17783.3(x)(1) (Gas Gas Management System: Conceptual gas system plan Appendix B, <br /> Mgmt. System) shown on Drawings P9 and P10. CEP Dwg. P9 <br /> CEP Dwg. P10 <br /> III.B. DESIGN CALCULATIONS <br /> III.B.1. Site Capadity 14 CCR 18222(c) Capacity Gross airspace capacity calculated by average end area Appendix C, <br /> section method from top of drainage layer to base of cover Revised Site Life <br /> foundation layer. See Revised Landfill Site Life Estimate for Estimate and <br /> gross air space and net waste capacity site. Revised Excavation <br /> and Fill <br /> Requirements <br /> III.B.2. Soil Availability 14 CCR 17681 (Available FDSR Section 1.5.5 and Table 1-5 discuss and show the soil Appendix C, <br /> Cover Material) mass balance for the site. The existing landfill has been Revised Site Life and <br /> implementing alternative daily cover programs which will Revised Excavation <br /> reduce the required quantities of daily soil cover. and Fill <br /> Requirements <br />
The URL can be used to link to this page
Your browser does not support the video tag.