Laserfiche WebLink
V.C.2. Standby Equipment 14 CCR 17694 Standby equipment may be obtained from the following firms: <br /> ■ Holt Brothers (209) 466-6000 <br /> ■ American Heavy Equipment (209) 462-9033 <br /> ■ U.S. Rentals (209) 948-9241 <br /> ■ A & A Tool Rentals (209) 948-9500 <br /> • Bob Evans Trucking (209) 239-3407 <br /> ■ Price Heavy Equipment (209) 465-3405 <br /> ■ Don Lawly Heavy Equipment (209) 466-8088 <br /> ■ American Equipment (209) 941-9856 <br /> V.C.3. Equipment Preventive 14 CCR 17695 Operator keeps a maintenance log on equipment. Equipment <br /> Maintenance is maintained (oil, coolant, air filters, etc.) based on <br /> manufacturer's recommended schedule. <br /> V.D. MATERIALS HANDLING ACTIVITIES <br /> V.D.1. Construction Sequencing Detailed construction sequencing plans for each phase of the Appendix B, <br /> landfill expansion is considered beyond the scope of the CEP Dwg. P2, <br /> conceptual expansion design. Generally for Phases I through CEP Dwg. P3 <br /> IV, the horizontal expansion phases, the phases will be <br /> excavated during the landfill operation to provide daily and <br /> intermediate cover material (See CEP Dwg. P3). An excess <br /> material stockpile is shown over the existing landfill (LF 1) <br /> area on CEP Dwg. P2. The vertical expansion, Phases V <br /> through VI, will not require stockpiling of material for <br /> development. <br /> The liner grading, waste filling and final grading sequence by <br /> expansion phase is shown on CEP Drawings P3 and P4. <br /> V.D.2. Unloading 14 CCR 17676 Unloading operation procedures will be similar to existing Appendix H, DEIR <br /> procedures. "L" shaped dumping arrangement will be used to Pages 11.24 to 11.27 <br /> minimize blown litter. <br /> V.D.3. Spreading and 14 CCR 17677 Unloading operation procedures will be similar to existing Appendix H, DEIR <br /> Compacting 14 CCR 17678 procedures. Dedicated landfill compactor (CAT 826 C) are Page 11.24 to 11.27 <br /> currently being used to spread and compact waste and will <br /> continue to be used in the landfill expansion. Maximum depth <br /> of uncompacted waste will be approximately 2 feet. Operation <br /> slopes on proposed landfill will be generally less than 10% <br /> grade. <br />