Laserfiche WebLink
VI.A.1..b.1. Frequency 14 CCR 17781(d)(1) An amendment will be filed at the time of final design of each <br /> 14 CCR 17781(d)(2) phase to describe sampling frequency. Minimum frequency <br /> 14 CCR 17781(d)(4) is assumed to be quarterly. <br /> VI.A.1.b.2. Sampling 14 CCR 17781(d)(5) An amendment will be filed at the time of final design of each <br /> phase to describe sampling procedures and analysis <br /> requirements for chemical parameter. <br /> VI.A.1.b.3. Reporting 14 CCR 17781(d)(6) An amendment will be filed at the time of final design of each <br /> phase to describe reporting requirements. <br /> VI.A.1.c. Leachate Collection and 23 CCR 2543 A description of the leachate collection system is outlined in Appendix B, <br /> Removal System 23 CCR 2543(a) the FDSR. General layout of the leachate collection and CEP Dwg. P1, <br /> 23 CCR 2543(b) removal system is indicated on Drawings P1, P3, and P4. CEP Dwg. P3, <br /> 23 CCR 2543(d) Details on Drawings P6 and P7 indicate conceptual leachate CEP Dwg. P4, <br /> collection methods. An amendment will be filed at the time of CEP Dwg. P6, <br /> final design of each phase; this amendment will address the CEP Dwg. P7 <br /> specific design, construction, maintenance, and operation Appendix I, FDSR <br /> requirements. Sec. 1.3, Pages, 1-5 <br /> to 1-12 <br /> VI.A.1.d. Treatment and Disposal <br /> VI.A.1.d.1. Treatment 14 CCR 17781(e)(2) Leachate will be stored in tanks on site and transported as Appendix I, FDSR <br /> necessary to a waste facility for treatment. Sec. 1.3.8, Page 1- <br /> 11 to 1-12 <br /> VI.A.1.d.2. Disposal 14 CCR 17781(e)(2)(B) Leachate will be stored on site and transported as necessary Appendix I, FDSR <br /> to a waste facility for treatment. A letter concerning the future Sec. 1.3.8., Page 1- <br /> disposal of leachate at the regional wastewater control facility 11 to 1-12 <br /> is attached as Appendix R. Appendix R <br /> VI.A.2. Vadose Zone Monitoring <br /> VI.A.2.a. Monitoring System 23 CCR 2550.7(d)(2)(B) Layout of the groundwater monitoring system is shown on Appendix B, <br /> Drawing P1. An amendment will be filed at the time of final CEP Dwg. P1, <br /> design of each phase; this amendment will address the CEP Dwg. P3, <br /> specific location of all background and detection monitoring CEP Dwg. P4, <br /> points. The leachate detection system consists of vadose CEP Dwg. P6 <br /> zone trench lysymeter system, which underlies the leachate <br /> collection trenches. The layout of the leachate collection <br /> system is shown on Drawings P3 and P4. Details are shown <br /> on Drawing P6. <br />