Laserfiche WebLink
Pacific Energy, a subcontractor to the City, is responsible for FDSR Sec. 3.5, <br /> collection of landfill gas at the existing landfill. They collect Pages 3-5 to 3-6 <br /> and burn the gas to produce up to 760 kilowatts per hour of Appendix B, <br /> electrical power that is sold to PG & E. This type of contract CEP Dwg. P1 <br /> will continue to be used at the expanded landfill. In addition, <br /> gas extraction wells with overlapping radii of influence will be <br /> used in conjunction with collection laterals and transmission <br /> mains to convey the gas to a blower/flare facility. An <br /> amendment will be filed at the time of final design of each <br /> phase; this amendment will describe specific details of the gas <br /> control and monitoring system. <br /> VI.B.1. Monitoring System 14 CCR 17783.3(a)(1) Nine new gas monitoring probes are proposed for installation Appendix I, FDSR <br /> around the landfill, as indicated on Drawing P1. A typical gas Sec. 3.5, Pages 3-5 <br /> monitoring probe is found in the FDSR as Figure 3-1. An to 3-6 <br /> amendment will be filed at the time of final design of each Appendix B, <br /> phase. The existing monitoring system layout and well logs CEP Dwg. P1 <br /> are in Appendix P. Appendix P <br /> VI.B.2. Gas Control or Recovery 14 CCR 17783.3(a)(2)(C) The gas recovery system is expected to be an active gas Appendix F, Gas <br /> System 14 CCR 17783.3(a)(2)(D) extraction system using vertical wells and/or horizontal Generation Analysis <br /> 14 CCR 17783.3(a)(2)(E) extraction trenches with perforated pipe. Drawings P9 and Appendix I, FDSR <br /> P10 show a conceptual gas system design. The system will Sec. 3.5, Pages 3-5 <br /> have a main perimeter header located outside of the landfill. to 3-6 <br /> Because of the minimal grade around the perimeter of the Appendix B, <br /> landfill, a series of sumps may be required to prevent CEP Dwg. P9, <br /> condensate buildup in the head pipe. Disposal will be at the CEP Dwg. P10 <br /> PG & E power plant or to an on-site flare facility. A RDSI <br /> amendment will be filed at the time of final design for major <br /> stages of the gas control system. <br /> VI.B.3. Monitoring <br /> VI.B.3.a. Method and Frequency 14 CCR 17783.7(b) An amendment will be filed at the time of final design of each Appendix I, FDSR <br /> 14 CCR 17783.7(c) phase; this amendment will describe the method and Sec. 3.6, Pages 3-5 <br /> frequency of gas monitoring on-site. Minimum frequency is to 3-6 <br /> assumed to be quarterly. Monitoring reports for the existing Appendix Q <br /> system are included in Appendix Q. <br />