Laserfiche WebLink
V.C.2. Standby Equipment <br />14 CCR 17694 <br />Standby equipment may be obtained from the following firms- <br />■ Holt Brothers (209) 466-6000 <br />® American Heavy Equipment (209) 462-9033 <br />■ U.S. Rentals (209) 948-9241 <br />■ A & A Tool Rentals (209) 948-9500 <br />■ Bob Evans Trucking (209) 239-3407 <br />■ Price Heavy Equipment (209) 465-3405 <br />■ Don Lawly Heavy Equipment (209) 466-8088 <br />■ American Equipment (209) 941-9856 <br />V.C.3. Equipment Preventive <br />14 CCR 17695 <br />Operator keeps a maintenance log on equipment. Equipment <br />Maintenance <br />is maintained (oil, coolant, air filters, etc.) based on <br />manufacturer's recommended schedule. <br />V.D. MATERIALS HANDLING ACTIVITIES <br />V.D.1. Construction Sequencing <br />Detailed construction sequencing plans for each phase of the <br />Appendix B, <br />landfill expansion is considered beyond the scope of the <br />CEP Dwg. P2, <br />conceptual expansion design. Generally for Phases I through <br />CEP Dwg. P3 <br />IV, the horizontal expansion phases, the phases will be <br />excavated during the landfill operation to provide daily and <br />intermediate cover material (See CEP Dwg. P3). An excess <br />material stockpile is shown over the existing landfill (LF 1) <br />area on CEP Dwg. P2. The vertical expansion, Phases V <br />through VI, will not require stockpiling of material for <br />development. <br />The liner grading, waste filling and final grading sequence by <br />expansion phase is shown on CEP Drawings P3 and P4. <br />V.D.2. Unloading <br />14 CCR 17676 <br />Unloading operation procedures will be similar to existing <br />Appendix H, DEIR <br />procedures. "L" shaped dumping arrangement will be used to <br />Pages 11.24 to 11.27 <br />minimize blown litter. <br />V.D.3.. Spreading and <br />14 CCR 17677 <br />Unloading operation procedures will be similar to existing <br />Appendix H, DER <br />Compacting <br />14 CCR 17678 <br />procedures. Dedicated landfill compactor (CAT 826 C) are <br />Page 11.24 to 11.27 <br />currently being used to spread and compact waste and will <br />continue to be used in the landfill expansion. Maximum depth <br />of uncompacted waste will be approximately 2 feet. Operation <br />slopes on proposed landfill will be generally less than 10% <br />grade. <br />