Laserfiche WebLink
V.D.4. Special Handling <br />14 CCR 17741 <br />No burning of wastes will occur. <br />Appendix I, FDSR <br />Procedures <br />14 CCR 17742 <br />Sec. 2.1.7.3, Pages <br />14 CCR 17743 <br />No hazardous waste is accepted. <br />2-11 to 2-12 <br />14 CCR 17744 <br />14 CCR 18221(b) <br />Discharge of liquid or semi-solid liquid (i.e., waste containing <br />less than 50% solids), except dewatered sewage or water <br />treatment sludge as provided in Section 2523(c) of Chapter <br />15, is prohibited for existing facility. <br />Animals: Large dead animals are not accepted. Small dead <br />animals are taken to the City Animal Shelter. <br />V.D.S. Periodic Cover <br />14 CCR 17682 <br />Periodic cover operation procedures will be similar to existing <br />Appendix I, FDSR <br />14 CCR 17683 <br />procedures. Alternative materials are currently being used as <br />Sec. 2.1.7.3, s <br />14 CCR 17225.16 <br />daily cover. A detailed discussion of periodic cover is <br />2-11 to 2-12 <br />considered beyond the scope of this RDSI and will be <br />addressed by future amendments to the RDSI. <br />V.D.6. Intermediate Cover <br />14 CCR 17684 <br />One foot of intermediate cover is required for areas not <br />Appendix I, FDSR <br />Placement <br />(Intermediate Cover) <br />receiving additional waste for 180 days or more. <br />Sec. 2.1.7.3., Pages <br />14 CCR 17225.16 <br />2-11 to 2-12 <br />23 CCR 2544 <br />(Note: FDSR stated time requirement of 60 days, time <br />requirement has been corrected to 180 days as allowed by 14 <br />CCR 17684.) <br />V.D.7. Final Cover Placement <br />14 CCR 17773(b) <br />Areas available for final cover during the phase development <br />Appendix B, <br />23 CCR 2581 (a)(1) <br />of the landfill are shown on CEP Drawings P3 and P4. <br />CEP Dwg. P3, <br />23 CCR 2581 (a)(2) <br />Conceptual cover details are shown on CEP Drawings P6 and <br />CEP Dwg. P4, <br />23 CCR 2581 (a)(3) <br />P7. Generally final cover over the existing landfill, LF -1, will <br />CEP Dwg. P6, <br />23 CCR 2541 (e) <br />be a soil cover similar to as shown in Detail 1, Drawing P6 and <br />CEP Dwg. P7 110 <br />14 CCR 17773(a) <br />final cover over the expansion phases will be a composite <br />14 CCR 17773(c) <br />type cover (low permeability soil and geomembrane) as <br />shown in Detail 2, Drawing P6. <br />Alternate materials or designs may be used upon regulatory <br />Appendix C <br />approval. Amendments to the RDSI will be filed as required <br />for each stage of the final closure; amendments will include <br />the affirmation that a registered civil engineer or certified <br />engineering geologist was responsible for the cover design. <br />