Laserfiche WebLink
Table 4 <br /> WASTE CAPACITY EARTHWORK/ SOIL COVER REQUIREMENTS <br /> Item Description Ouantity <br /> Total Capacity (cubic yards) ' 109,194,000 <br /> Total Refuse Capacity (cubic yards)2 76,587,000 <br /> Total Refuse Capacity + Daily Cover (cubic yards)2 102,116,000 <br /> Service Life (years)3 61 <br /> Earthwork (cubic yards) <br /> Total Excavation' 34,800,000 <br /> Soil Cover Requirements (cubic yards) <br /> Liner Operations Layer' 2,211,000 <br /> Daily Covert 25,529,000 <br /> Final Cover' 4,867,000 <br /> Total Soil Needs (cubic yards) 32,607,000 <br /> Soil Balance (cubic yards) 2,193,000 <br /> ' Based on Preliminary Closure Plan dated May 6, 1994 . <br /> 2 Assumes ratio of waste fill to daily and intermediate cover of <br /> 3 : 1. <br /> 3 Based on cumulative tonnage of refuse and daily cover <br /> prepared by San Joaquin County, Department of Public Works <br /> (Table 5) . <br /> The service life of the landfill, 61 years, was calculated based on <br /> County waste quantity records, the Preliminary Closure Plan, a 5% <br /> assumed annual growth rate, and accounting for the provisions of AB <br /> 939. Table 5 shows the projected landfill life of the Foothill <br /> Sanitary Landfill. A list of assumptions used to determine waste <br /> quantities shown on Table 5 follows the table. <br /> 5. 0 SITE LOCATION AND ACCESS <br /> The Foothill Sanitary Landfill is located in sections 12 and 13 in <br /> Township 2 North, Range 9 East, Mount Diablo Base Meridian (Figure 2) . <br /> 18 <br />