Laserfiche WebLink
* Preliminary final grades for future landfill phases <br /> * Site life projections <br /> * Preliminary excavation plans for the next lined landfill <br /> unit <br /> 2.4 site operations: <br /> Operations to date have been by the Operator. This has included <br /> placement, compaction and cover of waste, excavation for cover, <br /> construction of access roads, construction of winter pads, and <br /> construction of drainage facilities. <br /> 5 <br />