My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 6:26:40 PM
Creation date
7/3/2020 10:41:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_1995_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 SITE EXCAVATION <br /> 3.1 Landfill Excavation plans <br /> The preliminary excavation plans for the site are on Drawing C-2 of <br /> the Preliminary Design Report (PDR) , dated August 22 , 1991. The <br /> grades shown are those for the top of the HDPE drainage net of the <br /> liner and LCRS. A 2-foot operations layer will be placed over the <br /> drainage net. <br /> Site excavation operations are divided into two categories; (1) <br /> excavation for construction of landfill liners and LCRS, and (2) <br /> excavation to obtain cover material for landfill operations. <br /> 3.2 Landfill liners and LCRS: <br /> Final excavation for construction of liners and the LCRS will be <br /> performed by contractors retained by the County. This will be done <br /> by issuance of technical construction documents for successful <br /> bidders by the County. The outside contractors will perform the <br /> excavation and stockpile of soil according to project <br /> specifications. <br /> 3.3 Cover excavation: <br /> Cover excavation will be performed by the Operator. The cover <br /> material will be obtained from the zones of excavation from the <br /> design plans for the site furnished by the County. The County will <br /> provide an excavation grading plan to the Operator showing <br /> elevation contours for the excavation. These grades will typically <br /> be a minimum of one foot above the excavation grades for the <br /> construction of the landfill liner. <br /> 3.4 Methods <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.