My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 6:26:40 PM
Creation date
7/3/2020 10:41:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_1995_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.1.4 Enforcement of Tarping Program <br /> The CDPW has implemented a tarping program for the Landfill. A <br /> copy of the program is in Appendix A. The Operator shall enforce <br /> applicable provisions of the program at the entry gate to the <br /> Landfill. <br /> 5.1.5 Construction of Litter Fences <br /> The Operator shall construct litter fences around the operational <br /> area of the Landfill to collect windblown waste. The fences shall <br /> be at least four feet high and shall be within 500 feet of the <br /> working face. The fences shall have a maximum mesh opening of <br /> three inches, and shall be capable of being moved with the use of <br /> hand tools, along with the changing position of the active landfill <br /> area. <br /> 5.2 Compaction of Waste <br /> The Operator shall use landfill compactor(s) of the type approved <br /> by the County for compaction of waste. The waste shall be <br /> compacted in layers that are not more than two feet thick. This <br /> should be accomplished by performing three to five passes over the <br /> layers(11) . This method shall be performed for layers of waste to <br /> build daily waste cells which are 6 to 8 feet in height. <br /> Waste placement on the working face of the active cell shall be <br /> such that the slope of the waste being compacted does not exceed 25 <br /> percent. The preferred slope of the working face is from 0 to 20 <br /> percent. The waste should be placed at the bottom of the working <br /> face and pushed up the slope of the working face to provide for <br /> (1) GRCDA Training Course Manual, Managing Sanitary Landfill <br /> Operations, September 1988 <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.