My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 6:26:40 PM
Creation date
7/3/2020 10:41:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_1995_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 SITE DRAINAGE <br /> 7.1 Perimeter drainage <br /> Perimiter drainage facilities consist of drainage ditches, culverts <br /> or other drainage structures which are outside of the ultimate <br /> design footprint of the Landfill. These facilities will be <br /> designed and constructed by the CDPW. Should the CDPW require <br /> construction of potions of these facilities by the Operator, the <br /> work would be performed outside the scope of this operations plan. <br /> 7.2 Interim Drainage <br /> Interim drainage consists of all drainage berms, ditches or other <br /> facilities, which are within the ultimate design footprint of the <br /> Landfill. The design of all interim drainage facilities will be <br /> performed by the CDPW. Construction of interim drainage facilities <br /> is described in 7. 2 . 1 and 7. 2 .2 . <br /> 7.2.1 Fill Areas Above Natural Terrain <br /> The Operator shall construct drainage berms and ditches necessary <br /> to divert storm water. flows away from waste and from the Landfill <br /> area to the perimeter drainage ditch for the site. The CDPW will <br /> provide the engineering design specifications for this work. The <br /> majority of the storm water flows will be directed from the <br /> Landfill by sloping the Landfill face toward the perimeter. The <br /> Operator shall accomplish this by sloping of interim landfill lifts <br /> as directed by the County, providing interim cover as described in <br /> Section 6. 2, and providing drainage berms over the site face at <br /> grades above the working area to divert storm water away from <br /> landfilling operations. <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.