My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 10:41:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995_2
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_1995_2.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEACHATE CONTROL MEASURES <br /> A dendritic Leachate Collection and Removal System will be <br /> installed. The system will be constructed as each module is <br /> excavated. It will consist of 2 ' of clay (1. 0 x 10-7 cm/sec <br /> permeability) overlain by a High Density Polyethylene (HDPE) <br /> liner, a geonet, leachate collection pipes, and a leachate <br /> collection sump. <br /> 6. COST <br /> Although the leachate collection and removal system <br /> will be installed before closure, additional work may <br /> be required, such as installation of additional <br /> collection sumps. <br /> Additional sumps, wells or other measures = $5,000 <br /> DRAINAGE SYSTEM INSTALLATION <br /> The drainage system will consist of perimeter ditching and <br /> natural finished drainage contours on the landfill surface. <br /> Since drainage features will be constructed as the site is <br /> developed, it is estimated that to provide closure drainage at <br /> any time in the landfill life would require a modified drainage <br /> system design. <br /> Since the total drain length for the entire site is approximately <br /> 24, 000 lineal feet, it is estimated that the length of drainage <br /> system to close any one module and provide adequate drainage <br /> would approximate no more than 10, 000 lineal feet of perimeter <br /> drainage ditching. It is estimated that a $1, 500 a day <br /> construction crew could grade about 500 feet of ditch per day. A <br /> crew would probably consist of a motorgrader, Caterpillar <br /> tractor, scraper, 2 operators, 1 laborer, and 1 grade setter. <br /> 7. COST <br /> a. Design = $ 5, 000 <br /> b. Field Engineering = $ 2, 000 <br /> C. Construction: <br /> ($1, 500 X 10, 000ft. /500 ft. /day) _ $ 30 , 000 <br /> $ 37, 000 <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.