Laserfiche WebLink
CLOSURE AND POSTCLOSURE PLANS <br /> Closure Plan = about $50, 000 and Postclosure Maintenance Plan = <br /> about $10, 000 <br /> 11. COST <br /> ($50, 000 + $10, 000) _ $ 60, 000 <br /> GROUNDWATER MONITORING SYSTEM <br /> The groundwater monitoring system is already in place at the <br /> Foothill Sanitary Landfill for the opening of the initial module. <br /> It consists of one background monitoring well and two <br /> downgradient wells (Figure 3) . Each well is equipped with an <br /> individual dedicated pump for sampling. It is anticipated that <br /> two additional monitoring wells will be necessary as the site <br /> develops. <br /> 12 . COST <br /> Each additional well (including drilling, field <br /> supervision, and pump installation) = approximately <br /> $30, 000 <br /> ($30, 000 x 2) _ $ 60,000 <br /> 25 <br />