My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j. Vehicle Maintenance <br /> k. Scales and/or weighing fees <br /> 1. Grading and preparing access roads, stockpile, and borrow <br /> source <br /> M. Over building due to survey and equipment accuracy and <br /> tolerances <br /> n. Removal of existing termination berms and connection of <br /> existing and new liner and LCRS components, including <br /> collecting and transporting leachate to the onsite leachate pond <br /> o. Protection of imported soil stockpiles <br /> p. Control testing <br /> q. LCRS pipe crossing points <br /> r. Traffic control, including flagging, for construction vehicle <br /> crossing <br /> S. Grading for drainage around perimeter <br /> t. Removal and replacement of existing fence during excavation <br /> U. Maintaining and protecting the top of the clay liner surface from <br /> desiccation and damage for 5 days following completion of the <br /> Clay Liner <br /> V. Testing of lysimeters <br /> W. Removal of sandbags, if necessary <br /> X. Unloading of geosynthetics, if necessary <br /> y. Loading, transport, hauling, dumping of waste encountered <br /> during connection of existing and new liners or during anchor <br /> trench excavation <br /> 4.4 LEACHATE PIPES <br /> A. Measurement: <br /> 1. Measurement for payment for furnishing and installing the HDPE leachate <br /> collection, riser, and header pipes shall be by the linear foot of pipe <br /> installed, including all elbows, tees, wyes, caps, stainless steel clamps, or <br /> other joints, and excluding wasteage. <br /> 2. Quantities will be calculated by measurements made along the plane of <br /> installation to the dimensions shown on the Construction Drawings, or, if <br /> the Construction Drawing dimensions are modified by the OWNER, <br /> DESIGN ENGINEER or QA/QC CONSULTANT, on the basis of as-built <br /> surveys. <br /> B. Payment: <br /> 1. Payment for furnishing and installing all pipe shall be by the unit price per <br /> linear foot quoted in the Bid Form. <br /> Forward Landfill WMU FU-04 <br /> 01200 7 PRICE AND PAYMENT PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.