My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Coarse Gravel Material shall contain no limestone or other material that will <br /> adversely react with leachate. <br /> E. The Coarse Gravel shall be provided by the EARTHWORK CONTRACTOR <br /> 2.8 PROTECTIVE OPERATIONS LAYER <br /> A. The material shall consist of generally sandy material excavated onsite. The <br /> material will be located within an onsite stockpile. Protective operations layer <br /> placed directly above geosynthetics shall have no angular particles greater than <br /> 1 inch. <br /> 2.9 PLYWOOD SHEETING <br /> A. Plywood sheeting shall be exterior grade and provided at the dimensions shown <br /> on the Construction Drawings. <br /> 2.10 EQUIPMENT <br /> A. General: <br /> 1. Equipment used in constructing the Work shall be in good working order and <br /> shall be operated in strict accordance with manufacturer's instructions and <br /> recommendations. <br /> 2. Any soils contaminated by discharge of fluids from leaky or faulty equipment <br /> shall be removed and properly disposed and the contaminated area backfilled <br /> with clean soil, at no cost to the OWNER. <br /> B. Clay Processing Equipment <br /> 1. Use clay processing equipment meeting the following requirements: <br /> a. Of a type and of sufficient size to process the onsite clay material to <br /> meet requirements for maximum clod size and to provide a <br /> homogeneously moisture conditioned material. <br /> b. Consisting of rotovator, discs, tilling, or other methods as necessary and <br /> as selected by the EARTHWORK CONTRACTOR, and of as many <br /> pieces of processing equipment as necessary for EARTHWORK <br /> CONTRACTOR-selected production rates to meet the construction <br /> completion deadlines. <br /> C. Compaction Equipment <br /> 1. Compaction equipment shall be of suitable type and adequate to obtain the <br /> densities specified, and shall provide satisfactory breakdown of materials to <br /> form a dense fill. Flooding or jetting will not be allowed. <br /> 2. Compaction equipment shall be maintained in such condition that it will <br /> deliver the manufacturer's rated compactive effort. If inadequate densities <br /> are obtained, larger and/or different types of additional equipment shall be <br /> Forward Landfill WMU FU-04 <br /> 02300 7 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.