My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.3 SURFACE PREPARATION <br /> A. The EARTHWORK CONTRACTOR shall be responsible for preparing the <br /> supporting(subgrade) soil. <br /> B. The subgrade shall be prepared in accordance with Section 02300, EARTHWORK. <br /> C. The subgrade surface shall be proof-rolled to identify soft zones, and eliminate <br /> irregularities, ruts, and abrupt changes in grade. Any unacceptable areas shall be <br /> repaired by the EARTHWORK CONTRACTOR, at no additional cost to the <br /> OWNER. <br /> 3.4 ANCHORAGE SYSTEM <br /> A. The anchor trench shall be excavated by the EARTHWORK CONTRACTOR prior <br /> to geosynthetic clay liner placement, to the lines and grades shown on the drawings. <br /> B. No loose soil shall be allowed in the anchor trench beneath the geosynthetics. <br /> C. The geosynthetic clay liner shall be anchored with compacted general earthfill, as <br /> identified on the drawings. <br /> D. Care shall be taken when backfilling the trenches to prevent any damage to the <br /> geosynthetic clay liner. <br /> 3.5 HANDLING AND PLACEMENT <br /> A. The GEOSYNTHETICS CONTRACTOR shall handle all geosynthetic clay liners <br /> in such a manner to prevent any damage. <br /> B. Geosynthetic clay liners shall be cut using a utility blade in a manner approved by <br /> the QA/QC CONSULTANT. Any damage to any underlying liner system <br /> components during cutting will be repaired by the GEOSYNTHETICS <br /> CONTRACTOR, at no cost to the Owner. <br /> C. During placement, care shall be taken not to entrap stones or moisture under the <br /> geosynthetic clay liner. Care shall be taken not to walk on or drag equipment across <br /> the exposed geosynthetic clay liner. <br /> D. Any geosynthetic clay liner damaged by stones or other foreign objects, or by <br /> installation activities, shall be replaced by the GEOSYNTHETICS CONTRACTOR <br /> at no additional cost to the OWNER. <br /> E. The geosynthetic clay liner shall not be installed on an excessively moist subgrade <br /> or on standing water. The geosynthetic clay liner shall be installed in a way that <br /> prevents hydration prior to completion of construction of the liner system. <br /> Forward Landfill WMU FU-04 7 GEOSYNTHETIC CLAY LINER (GCL) <br /> 02777 <br />
The URL can be used to link to this page
Your browser does not support the video tag.