My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 EXECUTION <br /> 3.1 FAMILIARIZATION <br /> A. Prior to implementing any of the work described in this Section, the <br /> GEOSYNTHETICS CONTRACTOR shall become thoroughly familiar with the <br /> site,the site conditions, and the portions of the work falling within this Section. <br /> B. Inspection: <br /> 1. Prior to implementing any of the work of this Section, the <br /> GEOSYNTHETICS CONTRACTOR shall carefully inspect the installed <br /> work of all other Sections and verify that all such work is complete to the <br /> point where the installation of this Section may properly continence without <br /> adverse impact. <br /> 2. If the GEOSYNTHETICS CONTRACTOR has any concern regarding the <br /> installed work of other Sections, he should immediately notify the QA/QC <br /> CONSULTANT prior to start of work of the Section. Installation of the <br /> geosynthetic clay liner will be construed as GEOSYNTHETICS <br /> CONTRACTOR'S acceptance of the related work of all other Sections, <br /> including the subgrade. <br /> 3.2 ACCEPTANCE TESTING <br /> A. Upon delivery to the site, samples of the geosynthetic clay liner shall be removed by <br /> the QA/QC CONSULTANT and tested to ensure conformance to these <br /> Specifications. Only materials passing the acceptance tests shall be installed. <br /> B. Samples shall be selected by the QA/QC CONSULTANT in accordance with the <br /> procedure outlined in the CQA Manual. <br /> C. Samples shall be taken at the rate of one sample per lot or one per 100,000 sq. ft <br /> (9,300 sq. m), whichever is greater and tested for bentonite mass per unit area, peel <br /> strength and hydraulic conductivity. Direct Shear tests as described in Section <br /> 2.l.A.7 shall also be performed. <br /> D. The QA/QC CONSULTANT will increase the frequency of sampling in the event <br /> that test results are negative. This additional testing shall be performed at the <br /> expense of the GEOSYNTHETICS CONTRACTOR. <br /> E. Any materials that are not certified by the Manufacturer in accordance with this <br /> section, or that has a hydraulic conductivity greater than that specified in this <br /> Section shall be rejected and replaced, at no additional cost to the OWNER. <br /> Forward Landfill WMU FU-04 6 GEOSYNTHETIC CLAY LINER(GCL) <br /> 02777 <br />
The URL can be used to link to this page
Your browser does not support the video tag.