My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Municipal solid waste (Class III refuse) is currently being placed in WMU ART-03 at a 3:1 grade. <br /> Once refuse placement in WMU ART-03 achieves final grades,an approximately 4-ft thick layer of <br /> subgrade fill will be placed over the refuse to provide support for the side slope interface liner. The <br /> side slope interface liner will be placed to separate the municipal solid wastes in WMU ART-03 <br /> from the designated wastes(Class II refuse)placed in WMU FU-03. The side slope interface liner <br /> consists of a geosynthetic clay liner (GCL) overlain by a 60-mil, single-sided textured, HDPE <br /> geomembrane,and a single-sided geocomposite drainage net(GDN). Leachate from this portion of <br /> the WMU FU-04 construction will drain into WMU FU-03. <br /> A relatively flat area exists between the toe of the WMU ART-03 refuse and the top of the <br /> approximately 5:1 former Austin Road Landfill southern slope. Because this area is underlain by <br /> refuse, geogrid reinforcement will be placed in this area to support the overlying liner and LCRS. <br /> 1.3 Reference Documents <br /> The following reference documents provide background information and support this CQA manual: <br /> • WMUFU-04 Design and Construction Documents, Forward Landfill, BAS and Lewis <br /> Engineering, 2004. <br /> • American Society for Testing and Materials (ASTM)Annual Book of ASTM Standards. <br /> Section 4 Construction, Volume 04.02 Concrete and Aggregates. <br /> • American Society for Testing and Materials (ASTM)Annual Book of ASTM Standards. <br /> Section 4 Construction, Volume 04.08 Soil and Rock; Dimension Stone; <br /> GEOSYNTHETICS. <br /> • American Society for Testing and Materials (ASTM)Annual Book of ASTM Standards. <br /> Section 8 Plastics, Volumes 08.01 Plastics (I), 08.02 Plastics (II), and 08.03 Plastics <br /> (III). <br /> • American Association of State Highway and Transportation Officials (AASHTO), <br /> Specifications and Volume II Tests. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.