My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 CONSTRUCTION QUALITY ASSURANCE <br /> FOR GEOSYNTETICS <br /> 4.1 General <br /> The objectives of the geosynthetics CQA program are to: (i) assure that proper construction <br /> techniques and procedures are used; and (ii) that the project is completed in accordance with the <br /> Construction Drawings and Specifications. The intent of the CQA program is to: (i)to identify and <br /> define problems that may occur during construction; and (ii) to verify that these problems are <br /> corrected before construction is complete. <br /> This section describes CQA procedures for the installation of geosynthetic components. The <br /> following types of geosynthetics will be utilized for this project: <br /> • Non-woven filter and cushion geotextile; <br /> • 60-mil HDPE single and double sided textured geomembrane; <br /> • Geocomposite Drainage Net (geotextile on one side); <br /> • Geosynthetic Clay Liner; and <br /> • Geogrid. <br /> CQA for the geosynthetics installations will be performed to verify that geosynthetics are installed in <br /> accordance with the design. Construction must be conducted in accordance with the Construction <br /> Drawings and Specifications. To monitor compliance, the CQA program will (i) review the <br /> Contractor's quality control submittals; (ii) perform material acceptance testing; (iii) monitor and <br /> perform seam testing; and (iv)monitor installations. <br /> Control testing will be performed by the material manufacturer. The manufacturer will submit a <br /> quality control program prior to construction for the QA/QC Consultant to review and approve.The <br /> manufacturer's testing shall comply with the standards and frequencies as contained in the <br /> Specifications. Acceptance criteria are defined in the Specifications. <br /> All CQA testing will be conducted in accordance with this CQA manual,and the Specifications. If a <br /> discrepancy exists in the testing requirements,the document that requires the most stringent testing <br /> will govern. <br /> Page 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.