My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2 Geomembrane <br /> 4.2.1 Delivery <br /> Upon delivery of geomembrane, the QA/QC Inspector will: <br /> • Inspect geomembrane rolls for damage during shipping and handling. Identify damaged <br /> materials and verify that damaged materials are set aside. <br /> • Verify that the geomembrane is stored in accordance with the Specifications and is <br /> protected from puncture, dirt, grease, water, moisture, mud, mechanical abrasions, <br /> excessive heat, direct sunlight, and other damage. <br /> • Verify that all manufacturing documentation required by the Specifications has been <br /> received. <br /> • Verify that the geosynthetics receipt log form has been completed for all geomembrane <br /> materials received. <br /> Damaged geomembrane maybe rejected. If rejected,verify that material is removed from the site or <br /> stored at a location,separate from accepted geomembrane. Geomembrane that does not have proper <br /> manufacturer's documentation must be stored at a separate location,until all documentation has been <br /> received, reviewed and accepted. <br /> 4.2.2 Acceptance Testing <br /> Tests. One geomembrane sample will be obtained for every 100,000 square feet of material supplied <br /> and a minimum of one per lot or batch. The material will be sampled at the site by the QA/QC <br /> Inspectors or at the manufacturing plant by an independent third party under the direction of the <br /> QA/QC Consultant. The samples will be forwarded to an independent testing laboratory for the <br /> following acceptance tests: <br /> • Density(ASTM D1505 or D792, Method A) <br /> • Carbon black content (ASTM D4218) <br /> • Carbon black dispersion (ASTM D5596) <br /> • Thickness (ASTM D5994) <br /> • Tensile properties (ASTM D638) <br /> • Asperity(GM-12) <br /> The QA/QC Consultant shall perform the above listed material acceptance testing. The QA/QC <br /> Manager will review all acceptance test results and report any non-conformance to the <br /> Construction Manager and Contractor. <br /> Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.