My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to the above listed acceptance testing, the QA/QC Consultant shall perform interface <br /> direst shear tests between the following surfaces: <br /> • 60-mil textured HDPE geomembrane/clay liner <br /> • GCL/60-mil textured HDPE geomembrane/Geocomposite Drainage Net <br /> • 60-mil textured HDPE geomembrane/cushion geotextile <br /> The QA/QC Consultant shall obtain representative samples of all required materials to perform a <br /> 12-inch by 12-inch direct shear tests in accordance with ASTM D5321. The direct shear tests shall <br /> be performed as described in the Specifications. The results of all interface direct shear testing shall <br /> be provided in the CQA Report and to the Design Engineer. The Design Engineer will use these <br /> results to modify the refuse fill configuration for WMU FU-04, if necessary. <br /> Sampling Procedure. Samples will be taken across the entire roll width. Samples may be cut for <br /> shipping purposes, but a minimum of five square feet must be sent to the testing laboratory. <br /> Samplers must mark the machine direction and the manufacturer's roll identification number on the <br /> sample(each piece). Samplers will also assign an acceptance test number to the sample and mark <br /> the sample with that number. <br /> 4.2.3 Geomembrane Installation <br /> Surface Preparation. The soil surface must be prepared in accordance with the Specifications. <br /> Before geomembrane installation, the subgrade will be inspected by the QA/QC Inspector and <br /> Geosynthetics Contractor. The QA/QC Inspector must verify the following: <br /> • All lines and grades for soil surface have been verified by the Earthwork Contractor. <br /> • The soil surface has been rolled and compacted to be free of surface irregularities,loose <br /> soil, and protrusions. <br /> • The soil surface does not contain stones or other objects that could damage the <br /> geomembrane. <br /> • The anchor trench dimensions have been checked, and the trenches are free of sharp <br /> objects and stones. <br /> • There are no excessively soft areas. <br /> • The soil surface is not saturated, and no standing water is present. <br /> • The soil surface has not desiccated. <br /> Page 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.