My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Verify that crews working on the geogrid do not smoke, wear shoes that could damage <br /> the geogrid, or engage in activities that could damage the geogrid. <br /> • Verify that the geogrid is lain flat, free of wrinkles, and securely anchored. <br /> • Verify that adjacent panels are overlapped and seamed in accordance with the <br /> Specifications. <br /> • Verify that all slack is removed from the placed geogrid before soil or other geosynthetics <br /> are placed on top of it. <br /> • Examine the geogrid after installation to ensure that no potentially harmful foreign <br /> objects are present. <br /> • Do not allow tracked vehicles to drive on uncovered geogrid. <br /> • The QA/QC Inspector must inform both the QA/QC Manager and the Geosynthetics <br /> Contractor if the above conditions are not met. <br /> 4.6.3 Repairs <br /> Repair procedures include: <br /> • Patching--used to repair large holes, tears, and small defective areas. <br /> • Removal--used to replace large defective areas where the preceding method is not <br /> appropriate. <br /> Repair procedures shall be performed per specifications. <br /> Page 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.