My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 CONSTRUCTION QUALITY ASSURANCE FOR HDPE <br /> PIPE <br /> 5.1 Introduction <br /> This section describes CQA procedures for high density polyethylene (HDPE) pipe installations. <br /> Perforated and solid HDPE pipe will be utilized to construct the leachate collection and recovery <br /> systems. <br /> CQA for the HDPE pipe installations will be performed to verify that HDPE pipe systems are <br /> installed in accordance with the design. Construction must be conducted in accordance with the <br /> Construction Drawings and Specifications. To monitor compliance, the CQA program will (1) <br /> review the Contractor's quality control submittals;(2)monitor construction testing;and(3)monitor <br /> installations. <br /> All construction testing will be conducted in accordance with the Specifications. <br /> 5.2 Construction Monitoring <br /> The following sections list monitoring requirements during HDPE pipe operations. <br /> 5.2.1 Delivery, Handling, and Storage <br /> • Verify that chains end hooks cable slings,or any other devices that may scar the pipe are <br /> not used to handlepy iP e. Widen nylon web slings are recommended to handle the pipe. <br /> • Verify that the pipe is not damaged during handling operations and that damaged pipe is <br /> separated from accepted pipe. <br /> • Verify that pipe out-of-roundness will not occur due to excessive stacking heights when <br /> the pipe is stored at the site. Recommended stacking heights for pipe are provided in the <br /> following chart: <br /> Page 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.