My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• A summary of work activities completed in the last week, and those expected to be <br /> performed in the next week. <br /> • A summary of deficiencies and/or defects, and resolutions. <br /> • Ongoing summary of changed and/or change orders to the work. <br /> • The signature of the QA/QC Manager. <br /> • On fourth week of each month the report will include a summary on on-site and third <br /> party laboratory test results. <br /> 6.3 Photographs <br /> Construction activities will be photographed. Photographs will include any significant problems <br /> encountered and corrective actions as will as document construction progress.The photographs will <br /> be identified by number,location,time,date,and photographer.The photographer should document <br /> the subject or the photograph, either on the back of the picture, or in a photograph log. One copy of <br /> the photographs and the negatives will be given to the Owner. <br /> 6.4 Design and Specification Changes <br /> Design and specification changes may be required during construction. Design and specification <br /> changes will only be made with written agreement of the Design Engineer and Owner. These <br /> changes will be made by change order to the contract. When change orders are issued,they will be <br /> prepared by the Construction Manager.The Construction Manager will distribute change orders for <br /> signature and execution to the required parties. <br /> 6.5 Final CQA Report <br /> At the completion of the project, the QA/QC Manager will submit a final CQA report. This report <br /> will document that the work has been performed in compliance with the Construction Drawings and <br /> Specifications. <br /> At a minimum, the report will contain: <br /> • A summary of all construction activities. <br /> • A summary of all laboratory and field test results. <br /> • Sampling and testing location drawings <br /> • A description of significant construction problems and the resolution of these problems. <br /> Page 52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.