My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® A list of changes from the Construction Drawings and Specifications and the <br /> justifications for these changes. <br /> • As-built record drawings. <br /> • A statement that the interface shear strength meet or exceed the specified requirements. <br /> If the interface shear strength results do not meet or exceed the specified requirements, <br /> contact the Design Engineer and append a revised stability analysis, prepared by the <br /> Design Engineer. <br /> • A statement of compliance with the construction contract documents and design intent <br /> signed and stamped by the QA/QC Manager, a professional engineer registered in the <br /> state of California. <br /> The as-built record drawings will accurately locate the constructed location of all work items, <br /> including the edge of geomembrane,location of piping,anchor trenches,etc.All surveying and base <br /> maps required for the development of the record drawings will be prepared by the Contractor and the <br /> Owner. The QA/QC Manager must review and verify that as-built drawings are correct. As-built <br /> record drawings will be included in the final CQA report. <br /> Page 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.