My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2006_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Sec. 10-1, Construction Details <br /> Std. Spec.Sec 13 <br /> Special <br /> Page 7 of 9 <br /> 3.06 SOIL GAS WELL INSTALLATION <br /> A. General <br /> 1 Well installations shall be coordinated with EHD inspector. <br /> 2 Contractor shall place items specified in the construction drawings and in <br /> ' these specifications in the presence of the EHD inspector. <br /> 3 Any boring that collapses during well installation shall be re-drilled to the <br /> specified depth at no additional cost to the County. <br /> B. Probe Pipe Installation <br /> ' 1 Insert each probe pipe carefully in the well borehole. <br /> 2 Do not bend the probe pipe or make any kinks. <br /> 3 Probe pipes shall be in tension at all times and shall be to a near-straight <br /> position in the borehole. The straightness of the probe pipe can be <br /> ' checked by shining a flashlight in the borehole. <br /> 4 Maintain probe pipe identification. <br /> ' C. Backfilling <br /> 1 Measure the depth of the well drilled from surrounding grade in the <br /> presence of the Engineer and EHD inspector before backfilling. <br /> 2 The depth and length of the pea gravel sampling zones may be adjusted <br /> by the Engineer based on geologic data obtained during drilling. <br /> ' 3 Remove any loose vegetation from the area of the borehole. Do not allow <br /> any organic materials into the borehole. <br /> 4 Place backfill materials in a controlled manner to avoid bridging, <br /> ' overfilling the boring, or damaging the probe pipes. <br /> 5 Confirm with the Engineer the required depths of sampling intervals. <br /> ' Periodically measure depths of pea gravel backfill from the existing grade <br /> level with a weighted measuring tape. <br /> ' 6 Measure the final top pea gravel sampling interval depth of each pipe <br /> probe from surrounding grade with a weighted measuring tape in the <br /> presence of the EHD inspector and the Engineer. <br /> 7 Measure the top depth of each bentionite plug from surrounding grade <br /> with a weighted measuring tape in the presence of the EHD inspector and <br />
The URL can be used to link to this page
Your browser does not support the video tag.