My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2006_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t Sec. 10-1, Construction Details <br /> Std. Spec.Sec 13 <br /> Special <br /> Page 8 of 9 <br /> the Engineer. Provide the number of bentonite bags used for each <br /> bentonite plug to the Engineer. <br /> tD. Probe Pipe Valve Installation. <br /> 1 Probe pipe valve installation shall be done after installation of the well <br /> enclosure per section 55-S. <br /> 2 Cut probe pipes to install probe pipe valves. When installed, probe pipe <br /> valves shall have clearance from the top of the well enclosure lid as <br /> specified in the well enclosure details. <br /> 3 Paint probe pipe valves per the depth of the probe pipe prior to <br /> installation as follows. <br /> a Deep probe pipe: Yellow/Gold <br /> ' b Intermediate probe pipe: Blue <br /> tc Shallow probe pipe: Red <br /> 4 Install all threaded fittings with Teflon tape. All fittings shall be secure and <br /> ' tight. <br /> 5 Install the probe pipe valve on the probe pipe. <br /> t6 Install blank identification tags on the top of the probe pipe as follows: <br /> a Deep probe pipe: Yellow/Gold <br /> ' b Intermediate probe pipe: Blue <br /> ' c Shallow probe pipe: Red <br /> The tags shall be secured on the probe pipe with stainless steel tie wires, <br /> ' or equivalent. The identification tags shall not slide on the probe pipe when <br /> secured. <br /> 3.07 FINISHED GRADE RESTORATION <br /> A Restore areas disturbed by work to approximate conditions. Work shall be <br /> ' considered complete when all construction materials, debris, and equipment are <br /> removed from the sites, and boring locations are in clean condition. <br /> ' B Surplus Backfill Materials: Transport and remove surplus backfill materials from <br /> the staging area. <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.